RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008884 - Archived data from Tue, 11. August 2020 17:36:47 CEST


This is all the information about APD 0822008884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008884
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026200/0822008884
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 202
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.7501825 V     T = -25 °C: 348.982428 V
Voltage for Gain 150: T = +20 °C: 392.6160075 V     T = -25 °C: 356.4250579 V
Voltage for Gain 200: T = +20 °C: 396.9955555 V     T = -25 °C: 360.5828476 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.649698054 V-1     T = -25 °C: 4.869274572 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.068168331 V-1     T = -25 °C: 9.871727222 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05465561 V-1     T = -25 °C: 15.42380011 V-1
Break-through voltage: T = +20 °C: 411.9185482 V     T = -25 °C: 375.654577 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:29 CET jreher Updated box and position via API.
11. Aug 2020 17:36:47 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:36 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:59 CET jreher Updated box and position via API.
27. Nov 2019 20:04:53 CET jreher Updated APD location via API.
25. Nov 2019 17:26:49 CET jreher Updated box and position via API.
13. Aug 2019 14:51:03 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 13:23:40 CEST markus.moritz
22. Jun 2016 15:29:42 CEST Tobias Imported from Hamamatsu datasheet.