RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0822008882 - Archived data from Tue, 11. August 2020 17:36:46 CEST


This is all the information about APD 0822008882. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0822008882
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0822008882/2401025908
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 202
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9543139 V     T = -25 °C: 346.3968015 V
Voltage for Gain 150: T = +20 °C: 389.8216651 V     T = -25 °C: 353.7767192 V
Voltage for Gain 200: T = +20 °C: 394.2327399 V     T = -25 °C: 357.9181568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.526382674 V-1     T = -25 °C: 4.784951509 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.887552206 V-1     T = -25 °C: 9.49647484 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35625169 V-1     T = -25 °C: 14.92434099 V-1
Break-through voltage: T = +20 °C: 409.4353631 V     T = -25 °C: 372.9957251 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:29 CET jreher Updated box and position via API.
11. Aug 2020 17:36:46 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:05 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:49 CET jreher Updated box and position via API.
27. Nov 2019 20:04:53 CET jreher Updated APD location via API.
25. Nov 2019 17:26:49 CET jreher Updated box and position via API.
13. Aug 2019 14:51:03 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 13:21:40 CEST markus.moritz
22. Jun 2016 15:29:42 CEST Tobias Imported from Hamamatsu datasheet.