RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0820008781 - Archived data from Fri, 05. February 2021 11:12:53 CET


This is all the information about APD 0820008781. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0820008781
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.7 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 190
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.7573124 V     T = -25 °C: 352.6365383 V
Voltage for Gain 150: T = +20 °C: 396.6250994 V     T = -25 °C: 360.146804 V
Voltage for Gain 200: T = +20 °C: 400.9821835 V     T = -25 °C: 364.3857608 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651337428 V-1     T = -25 °C: 4.588213518 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.282818818 V-1     T = -25 °C: 9.14668007 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51534747 V-1     T = -25 °C: 14.22794406 V-1
Break-through voltage: T = +20 °C: 415.7212295 V     T = -25 °C: 379.4342578 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:03:45 CEST jreher Updated box and position via API.
21. Apr 2021 13:59:48 CEST jreher Updated box and position via API.
05. Feb 2021 11:12:53 CET jreher Updated box and position via API.
11. Aug 2020 17:34:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:02:41 CET jreher Updated APD location via API.
25. Nov 2019 17:25:52 CET jreher Updated box and position via API.
16. Aug 2019 10:43:33 CEST spankonin Updated APD batch assignment via API.
13. Aug 2019 12:17:29 CEST jreher Updated APD location via API.
09. Aug 2019 17:00:11 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 13:35:12 CEST markus.moritz
22. Jun 2016 15:29:39 CEST Tobias Imported from Hamamatsu datasheet.