RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008461 - Archived data from Tue, 11. August 2020 17:56:49 CEST


This is all the information about APD 0816008461. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008461
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 65
Position in grid: 4
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 388.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.5212846 V     T = -25 °C: 353.2953423 V
Voltage for Gain 150: T = +20 °C: 397.4432096 V     T = -25 °C: 360.861918 V
Voltage for Gain 200: T = +20 °C: 401.8342111 V     T = -25 °C: 365.1225633 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.366978985 V-1     T = -25 °C: 4.691006631 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.538951804 V-1     T = -25 °C: 9.369749593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.72800554 V-1     T = -25 °C: 14.63221523 V-1
Break-through voltage: T = +20 °C: 417.3648936 V     T = -25 °C: 380.8751056 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:43 CET jreher Updated box and position via API.
11. Aug 2020 17:56:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:16 CEST jreher Updated box and position via API.
19. Dec 2019 15:49:36 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:35 CET jreher Updated box and position via API.
23. Aug 2017 16:06:04 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:26:10 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:16 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:46:04 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:06 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:52 CEST Tobias Imported from Hamamatsu datasheet.