RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008433 - Archived data from Tue, 11. August 2020 17:59:01 CEST


This is all the information about APD 0816008433. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008433
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 311
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 64
Position in grid: 13
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 387.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.7291667 V     T = -25 °C: 351.6316982 V
Voltage for Gain 150: T = +20 °C: 395.6650571 V     T = -25 °C: 359.1866509 V
Voltage for Gain 200: T = +20 °C: 400.0628942 V     T = -25 °C: 363.4441942 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633252243 V-1     T = -25 °C: 4.588227024 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.164482456 V-1     T = -25 °C: 9.106617226 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29075087 V-1     T = -25 °C: 15.86950515 V-1
Break-through voltage: T = +20 °C: 415.4998817 V     T = -25 °C: 379.2671697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:35 CET jreher Updated box and position via API.
11. Aug 2020 17:59:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:29 CEST jreher Updated box and position via API.
28. Jan 2020 14:22:08 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:19 CET jreher Updated APD location via API.
19. Dec 2019 15:19:16 CET jreher Updated box and position via API.
23. Aug 2017 16:04:33 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:08:36 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:58 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:45:09 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:04 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:51 CEST Tobias Imported from Hamamatsu datasheet.