RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008415 - Archived data from Tue, 11. August 2020 17:58:58 CEST


This is all the information about APD 0816008415. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008415
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 385.8 V
Dark current: 2.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 311
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 63
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 385.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3779402 V     T = -25 °C: 350.594293 V
Voltage for Gain 150: T = +20 °C: 394.3215618 V     T = -25 °C: 358.0621993 V
Voltage for Gain 200: T = +20 °C: 398.7351074 V     T = -25 °C: 362.2796375 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.445999485 V-1     T = -25 °C: 4.671804476 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.615696131 V-1     T = -25 °C: 9.303316518 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.85248681 V-1     T = -25 °C: 14.56147669 V-1
Break-through voltage: T = +20 °C: 414.6384874 V     T = -25 °C: 378.2444537 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:34 CET jreher Updated box and position via API.
11. Aug 2020 17:58:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:34 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:28 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:54 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:15 CET jreher Updated box and position via API.
23. Aug 2017 16:05:51 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:24:32 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:44:42 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:51 CEST Tobias Imported from Hamamatsu datasheet.