RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008411 - Archived data from Fri, 05. February 2021 11:28:33 CET


This is all the information about APD 0816008411. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008411
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 2.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 311
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 63
Position in grid: 15
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 381.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.0116888 V     T = -25 °C: 346.3698213 V
Voltage for Gain 150: T = +20 °C: 389.9168799 V     T = -25 °C: 353.7503304 V
Voltage for Gain 200: T = +20 °C: 394.3185537 V     T = -25 °C: 357.8906768 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588971447 V-1     T = -25 °C: 4.811026404 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.986498969 V-1     T = -25 °C: 9.755133296 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92620549 V-1     T = -25 °C: 15.46831872 V-1
Break-through voltage: T = +20 °C: 410.1160559 V     T = -25 °C: 373.6164197 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:40:49 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:21 CET jreher Updated box and position via API.
05. Feb 2021 11:28:33 CET jreher Updated box and position via API.
11. Aug 2020 17:58:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:34 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:28 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:54 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:15 CET jreher Updated box and position via API.
23. Aug 2017 16:05:51 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:24:32 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:44:42 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:51 CEST Tobias Imported from Hamamatsu datasheet.