RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0815008380 - Archived data from Tue, 08. August 2017 17:54:23 CEST


This is all the information about APD 0815008380. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0815008380
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 379
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 61
Position in grid: 18
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 383.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:03:05 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:36:57 CET jreher Updated box and position via API.
13. Oct 2020 16:49:49 CEST vwerner Updated APD batch assignment via API.
08. Oct 2020 18:19:49 CEST jreher Updated APD location via API.
10. Aug 2017 15:14:55 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:54:23 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:08 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:41:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:59 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:50 CEST Tobias Imported from Hamamatsu datasheet.