RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0814008288 - Archived data from Tue, 11. August 2020 17:56:55 CEST


This is all the information about APD 0814008288. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0814008288
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 426 V
Voltage for Gain 100 (T=+25°C): 397.4 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 69
Position in grid: 1
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 397.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.9603056 V     T = -25 °C: 361.1988741 V
Voltage for Gain 150: T = +20 °C: 405.8224186 V     T = -25 °C: 368.917947 V
Voltage for Gain 200: T = +20 °C: 410.1782094 V     T = -25 °C: 373.2359711 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.61124717 V-1     T = -25 °C: 4.641344049 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.159505739 V-1     T = -25 °C: 9.164775241 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31871178 V-1     T = -25 °C: 14.34028093 V-1
Break-through voltage: T = +20 °C: 425.8667628 V     T = -25 °C: 389.1949107 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:47 CET jreher Updated box and position via API.
11. Aug 2020 17:56:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:28 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:19 CEST jreher Updated box and position via API.
19. Dec 2019 15:50:06 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:38 CET jreher Updated box and position via API.
10. Aug 2017 15:16:13 CEST hans-georg.zaunick Entered shipped after irradiation date.
09. Aug 2017 14:26:50 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:47 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:47:55 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:09 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:48 CEST Tobias Imported from Hamamatsu datasheet.