RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008149 - Archived data from Tue, 11. August 2020 17:35:14 CEST


This is all the information about APD 0812008149. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008149
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 192
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3820772 V     T = -25 °C: 350.1873418 V
Voltage for Gain 150: T = +20 °C: 394.230098 V     T = -25 °C: 357.6671982 V
Voltage for Gain 200: T = +20 °C: 398.5698417 V     T = -25 °C: 361.8708176 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.408557334 V-1     T = -25 °C: 4.727127264 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.613503379 V-1     T = -25 °C: 9.467100706 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91130991 V-1     T = -25 °C: 14.68107756 V-1
Break-through voltage: T = +20 °C: 413.8095375 V     T = -25 °C: 377.0867628 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:09 CET jreher Updated box and position via API.
07. Oct 2020 12:28:12 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:03 CET jreher Updated APD location via API.
25. Nov 2019 17:26:01 CET jreher Updated box and position via API.
16. Aug 2019 12:20:37 CEST jreher Updated APD location via API.
09. Aug 2019 16:25:33 CEST jreher Updated APD batch assignment via API.
07. Aug 2019 15:06:55 CEST markus.moritz
22. Jun 2016 15:26:18 CEST Tobias Imported from Hamamatsu datasheet.