RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008104 - Archived data from Fri, 05. February 2021 11:26:10 CET


This is all the information about APD 0812008104. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008104
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.6 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 109
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 376.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6456086 V     T = -25 °C: 342.3839401 V
Voltage for Gain 150: T = +20 °C: 385.5217093 V     T = -25 °C: 349.7262643 V
Voltage for Gain 200: T = +20 °C: 389.8811574 V     T = -25 °C: 353.8451886 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.377652947 V-1     T = -25 °C: 4.80263469 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.342629328 V-1     T = -25 °C: 9.728002602 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.66684666 V-1     T = -25 °C: 15.49401936 V-1
Break-through voltage: T = +20 °C: 403.5308111 V     T = -25 °C: 368.0639965 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:18:52 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:19 CET jreher Updated box and position via API.
05. Feb 2021 11:26:10 CET jreher Updated box and position via API.
11. Aug 2020 17:56:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:17 CEST jreher Updated box and position via API.
19. Dec 2019 15:43:52 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:03 CET jreher Updated box and position via API.
23. Aug 2017 16:05:34 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:10:29 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:01:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:30 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:17 CEST Tobias Imported from Hamamatsu datasheet.