RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007947 - Archived data from Tue, 11. August 2020 17:56:27 CEST


This is all the information about APD 0810007947. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007947
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.6 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 102
Position in grid: 2
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 389.6 V     (connection unknown)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.7850225 V     T = -25 °C: 353.5067378 V
Voltage for Gain 150: T = +20 °C: 397.6480538 V     T = -25 °C: 361.0541995 V
Voltage for Gain 200: T = +20 °C: 402.0018248 V     T = -25 °C: 365.2971699 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.652917192 V-1     T = -25 °C: 4.615213345 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.259227665 V-1     T = -25 °C: 9.188429216 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45151276 V-1     T = -25 °C: 14.35420476 V-1
Break-through voltage: T = +20 °C: 417.1559128 V     T = -25 °C: 381.021465 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:26 CET jreher Updated box and position via API.
11. Aug 2020 17:56:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:55 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:46 CEST jreher Updated box and position via API.
19. Dec 2019 15:46:11 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:19 CET jreher Updated box and position via API.
23. Aug 2017 15:54:49 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:42:43 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:00:42 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:27 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:13 CEST Tobias Imported from Hamamatsu datasheet.