Show Hamamatsu Avalanche Photo Diode 0810007928 - Archived data from Wed, 23. August 2017 15:54:25 CEST
					This is all the information about APD 0810007928. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 0810007928 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | unknown | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | G03 | 
| Break-through voltage: | 408 V | 
| Voltage for Gain 100 (T=+25°C): | 379.6 V | 
| Dark current: | 2.2 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 295 | 
| Position in Box: | 39 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 101 | 
| Position in grid: | 8 | 
| Arrival for irradiation: | 03. Aug 2017 | 
| Sent for analysis after irradiation: | 23. Aug 2017 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 10. Aug 2017 | 
| Dose used: | 45 Gy | 
| Temperature: | 20 °C | 
| Position: | 1 | 
| Bias voltage: | 379.6 V (connected) | 
| Annealing: | |
| Date: | none | 
| Temperature: | none | 
| Duration: | none | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none | 
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none | 
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none | 
| Break-through voltage: | T = +20 °C: none T = -25 °C: none | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 11:26:23 CET | jreher | Updated box and position via API. | 
| 11. Aug 2020 17:56:24 CEST | jreher | Updated APD characteristics via API. | 
| 21. Jul 2020 14:41:44 CEST | jreher | Updated APD location via API. | 
| 21. Jul 2020 14:41:35 CEST | jreher | Updated box and position via API. | 
| 19. Dec 2019 15:46:10 CET | spankonin | Updated APD batch assignment via API. | 
| 19. Dec 2019 15:17:14 CET | jreher | Updated box and position via API. | 
| 23. Aug 2017 15:54:25 CEST | markus.moritz | Entered shipped after irradiation date. | 
| 10. Aug 2017 16:41:58 CEST | hans-georg.zaunick | Entered irradiation information. | 
| 07. Aug 2017 16:58:49 CEST | hans-georg.zaunick | Entered arrival for irradiation date. | 
| 04. Aug 2017 03:15:25 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 22. Jun 2016 15:26:13 CEST | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					