RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007928 - Archived data from Tue, 11. August 2020 17:56:24 CEST


This is all the information about APD 0810007928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 2.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 101
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 379.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9432527 V     T = -25 °C: 344.3924544 V
Voltage for Gain 150: T = +20 °C: 387.8321252 V     T = -25 °C: 351.8101154 V
Voltage for Gain 200: T = +20 °C: 392.2307946 V     T = -25 °C: 355.9768957 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.58352152 V-1     T = -25 °C: 4.751290409 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.084388881 V-1     T = -25 °C: 9.670708569 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06936009 V-1     T = -25 °C: 15.21041027 V-1
Break-through voltage: T = +20 °C: 407.9512526 V     T = -25 °C: 371.9009245 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:23 CET jreher Updated box and position via API.
11. Aug 2020 17:56:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:44 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:35 CEST jreher Updated box and position via API.
19. Dec 2019 15:46:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:14 CET jreher Updated box and position via API.
23. Aug 2017 15:54:25 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:41:58 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:49 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:13 CEST Tobias Imported from Hamamatsu datasheet.