RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007923 - Archived data from Tue, 11. August 2020 17:56:24 CEST


This is all the information about APD 0810007923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007923
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 101
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 377.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2991269 V     T = -25 °C: 343.5529845 V
Voltage for Gain 150: T = +20 °C: 386.2207642 V     T = -25 °C: 351.0490305 V
Voltage for Gain 200: T = +20 °C: 390.628293 V     T = -25 °C: 355.3039647 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.480032132 V-1     T = -25 °C: 4.670878684 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.732362394 V-1     T = -25 °C: 9.331100434 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26893148 V-1     T = -25 °C: 14.33593817 V-1
Break-through voltage: T = +20 °C: 405.8823124 V     T = -25 °C: 369.0025182 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:22 CET jreher Updated box and position via API.
11. Aug 2020 17:56:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:44 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:35 CEST jreher Updated box and position via API.
19. Dec 2019 15:46:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:14 CET jreher Updated box and position via API.
23. Aug 2017 15:54:25 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:41:58 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:49 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:13 CEST Tobias Imported from Hamamatsu datasheet.