RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004913 - Archived data from Wed, 07. October 2020 15:44:24 CEST


This is all the information about APD 0612004913. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004913
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.9 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.3404691 V     T = -25 °C: 378.6121991 V
Voltage for Gain 150: T = +20 °C: 424.2279542 V     T = -25 °C: 386.7074976 V
Voltage for Gain 200: T = +20 °C: 428.5827608 V     T = -25 °C: 391.1125671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.447118679 V-1     T = -25 °C: 5.01788359 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.762592801 V-1     T = -25 °C: 9.08095815 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45737899 V-1     T = -25 °C: 14.1668069 V-1
Break-through voltage: T = +20 °C: 440.0126587 V     T = -25 °C: 406.4415843 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:21 CET jreher Updated box and position via API.
07. Oct 2020 15:44:24 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:16 CET jreher Updated APD location via API.
25. Nov 2019 17:30:21 CET jreher Updated box and position via API.
25. Nov 2019 15:26:49 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.