RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004902 - Archived data from Wed, 07. October 2020 15:44:25 CEST


This is all the information about APD 0611004902. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004902
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 417 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.6573594 V     T = -25 °C: 379.7216353 V
Voltage for Gain 150: T = +20 °C: 424.4919682 V     T = -25 °C: 387.5068727 V
Voltage for Gain 200: T = +20 °C: 428.8047449 V     T = -25 °C: 391.8007795 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.378607037 V-1     T = -25 °C: 4.730899986 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.582914385 V-1     T = -25 °C: 8.622469027 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91045628 V-1     T = -25 °C: 15.1276313 V-1
Break-through voltage: T = +20 °C: 439.9650107 V     T = -25 °C: 406.657328 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:23 CET jreher Updated box and position via API.
07. Oct 2020 15:44:25 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:44 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:17 CET jreher Updated APD location via API.
25. Nov 2019 17:30:22 CET jreher Updated box and position via API.
25. Nov 2019 17:23:03 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 17:07:33 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.