RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004897 - Archived data from Wed, 07. October 2020 15:44:32 CEST


This is all the information about APD 0611004897. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004897
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 420.8 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.7731513 V     T = -25 °C: 383.8335512 V
Voltage for Gain 150: T = +20 °C: 428.6344261 V     T = -25 °C: 391.6501426 V
Voltage for Gain 200: T = +20 °C: 432.9687887 V     T = -25 °C: 395.9692508 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644496524 V-1     T = -25 °C: 4.638906562 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.276685813 V-1     T = -25 °C: 9.344408522 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5236298 V-1     T = -25 °C: 14.60972975 V-1
Break-through voltage: T = +20 °C: 439.9594366 V     T = -25 °C: 411.0491351 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:30 CET jreher Updated box and position via API.
07. Oct 2020 15:44:32 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:16 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:31 CET jreher Updated APD location via API.
25. Nov 2019 17:30:44 CET jreher Updated box and position via API.
25. Nov 2019 17:15:49 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.