RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004877 - Archived data from Wed, 07. October 2020 15:44:02 CEST


This is all the information about APD 0611004877. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004877
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 423.7 V
Dark current: 10.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.7609641 V     T = -25 °C: 387.2973344 V
Voltage for Gain 150: T = +20 °C: 432.9308493 V     T = -25 °C: 395.3581004 V
Voltage for Gain 200: T = +20 °C: 437.4889589 V     T = -25 °C: 399.8360297 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576425123 V-1     T = -25 °C: 4.447377982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.708681665 V-1     T = -25 °C: 8.472227091 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82577323 V-1     T = -25 °C: 14.47957984 V-1
Break-through voltage: T = +20 °C: 440.0000697 V     T = -25 °C: 414.847537 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:34 CET jreher Updated box and position via API.
07. Oct 2020 15:44:02 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:08 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:22 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:19 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:44 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:19 CET jreher Updated APD location via API.
25. Nov 2019 17:27:20 CET jreher Updated box and position via API.
25. Nov 2019 15:23:31 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.