RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004872 - Archived data from Wed, 07. October 2020 15:43:58 CEST


This is all the information about APD 0611004872. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004872
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 450 V
Voltage for Gain 100 (T=+25°C): 424.8 V
Dark current: 15.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 205
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.8532814 V     T = -25 °C: 388.0453127 V
Voltage for Gain 150: T = +20 °C: 432.6606672 V     T = -25 °C: 395.8109502 V
Voltage for Gain 200: T = +20 °C: 436.9737525 V     T = -25 °C: 400.1230624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.681771195 V-1     T = -25 °C: 4.638152892 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.38373942 V-1     T = -25 °C: 9.268488576 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.82309862 V-1     T = -25 °C: 14.56641945 V-1
Break-through voltage: T = +20 °C: 440.0165227 V     T = -25 °C: 414.8481765 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:46 CET jreher Updated box and position via API.
07. Oct 2020 15:43:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:22 CET jreher Updated APD location via API.
25. Nov 2019 17:26:59 CET jreher Updated box and position via API.
25. Nov 2019 15:22:12 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.