RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004840 - Archived data from Tue, 11. August 2020 17:48:11 CEST


This is all the information about APD 0611004840. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004840
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 424.3 V
Dark current: 17.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 425.1044297 V     T = -25 °C: 388.3515604 V
Voltage for Gain 150: T = +20 °C: 432.9078801 V     T = -25 °C: 396.1125238 V
Voltage for Gain 200: T = +20 °C: 437.2261828 V     T = -25 °C: 400.4276491 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.614599106 V-1     T = -25 °C: 4.527847397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.177322108 V-1     T = -25 °C: 8.963073733 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33785829 V-1     T = -25 °C: 14.08476332 V-1
Break-through voltage: T = +20 °C: 439.9712846 V     T = -25 °C: 414.5311545 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:58 CET jreher Updated box and position via API.
07. Oct 2020 15:44:08 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:50 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:30 CET jreher Updated APD location via API.
25. Nov 2019 17:57:49 CET jreher Undo test change
25. Nov 2019 17:57:30 CET jreher Testing if applied correctly
25. Nov 2019 17:33:19 CET jreher Updated box and position via API.
25. Nov 2019 15:26:07 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.