Show Hamamatsu Avalanche Photo Diode 0610004830 - Archived data from Wed, 07. October 2020 15:44:07 CEST


This is all the information about APD 0610004830. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0610004830
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H05
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 409.4 V
Dark current: 40.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 409.9350211 V     T = -25 °C: 372.8905822 V
Voltage for Gain 150: T = +20 °C: 417.847851 V     T = -25 °C: 380.7378152 V
Voltage for Gain 200: T = +20 °C: 422.2229242 V     T = -25 °C: 385.0643864 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.554123707 V-1     T = -25 °C: 4.623219502 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.044679096 V-1     T = -25 °C: 9.218681216 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07388197 V-1     T = -25 °C: 14.46122377 V-1
Break-through voltage: T = +20 °C: 434.1434253 V     T = -25 °C: 398.1146948 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:57 CET jreher Updated box and position via API.
07. Oct 2020 15:44:07 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:50 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:29 CET jreher Updated APD location via API.
25. Nov 2019 17:33:19 CET jreher Updated box and position via API.
25. Nov 2019 15:26:07 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.