RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0809007905 - Archived data from Tue, 11. August 2020 17:33:53 CEST


This is all the information about APD 0809007905. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0809007905
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 186
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.2903914 V     T = -25 °C: 353.6917323 V
Voltage for Gain 150: T = +20 °C: 398.1725518 V     T = -25 °C: 361.2526334 V
Voltage for Gain 200: T = +20 °C: 402.5412729 V     T = -25 °C: 365.5034229 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47123209 V-1     T = -25 °C: 4.922548136 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.756694635 V-1     T = -25 °C: 8.999322126 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34297377 V-1     T = -25 °C: 15.86327424 V-1
Break-through voltage: T = +20 °C: 417.4802322 V     T = -25 °C: 380.51923 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:49:40 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:33 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:12:21 CET jreher Updated box and position via API.
11. Aug 2020 17:33:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:57 CET jreher Updated APD location via API.
25. Nov 2019 17:25:33 CET jreher Updated box and position via API.
13. Aug 2019 12:16:54 CEST jreher Updated APD location via API.
07. Aug 2019 14:10:26 CEST markus.moritz
05. Aug 2019 17:05:52 CEST jreher Updated APD batch assignment via API.
22. Jun 2016 15:26:12 CEST Tobias Imported from Hamamatsu datasheet.