RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005257 - Archived data from Tue, 11. August 2020 17:47:48 CEST


This is all the information about APD 0616005257. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005257
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 423.8 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 240
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.0591042 V     T = -25 °C: 386.8967074 V
Voltage for Gain 150: T = +20 °C: 431.9974644 V     T = -25 °C: 394.808595 V
Voltage for Gain 200: T = +20 °C: 436.3974214 V     T = -25 °C: 399.1862817 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.53801865 V-1     T = -25 °C: 4.608451316 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.932600492 V-1     T = -25 °C: 9.122768037 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92855662 V-1     T = -25 °C: 14.26237258 V-1
Break-through voltage: T = +20 °C: 439.9844939 V     T = -25 °C: 414.9423794 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:17 CET jreher Updated box and position via API.
11. Aug 2020 17:47:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:02 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:36 CET jreher Updated APD location via API.
25. Nov 2019 17:29:34 CET jreher Updated box and position via API.
21. Nov 2019 16:52:06 CET spankonin Updated APD location via API.
21. Nov 2019 16:49:46 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:40 CEST Tobias Imported from Hamamatsu datasheet.