RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005219 - Archived data from Tue, 11. August 2020 17:48:19 CEST


This is all the information about APD 0616005219. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005219
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 440 V
Voltage for Gain 100 (T=+25°C): 411.8 V
Dark current: 15.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 412.58286 V     T = -25 °C: 375.0354191 V
Voltage for Gain 150: T = +20 °C: 420.710892 V     T = -25 °C: 382.6640072 V
Voltage for Gain 200: T = +20 °C: 425.1951058 V     T = -25 °C: 387.6305394 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.375114557 V-1     T = -25 °C: 4.429621832 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.07702499 V-1     T = -25 °C: 9.097257515 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95750008 V-1     T = -25 °C: 14.75864867 V-1
Break-through voltage: T = +20 °C: 439.821295 V     T = -25 °C: 402.249838 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:05 CET jreher Updated box and position via API.
07. Oct 2020 15:44:12 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:19 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:00 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:40 CET jreher Updated APD location via API.
25. Nov 2019 17:29:48 CET jreher Updated box and position via API.
21. Nov 2019 16:53:20 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:38 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:37 CEST Tobias Imported from Hamamatsu datasheet.