RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005212 - Archived data from Wed, 07. October 2020 15:44:11 CEST


This is all the information about APD 0616005212. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005212
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 413.3 V
Dark current: 24.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.1779725 V     T = -25 °C: 376.0549219 V
Voltage for Gain 150: T = +20 °C: 421.1790085 V     T = -25 °C: 383.9620453 V
Voltage for Gain 200: T = +20 °C: 425.618509 V     T = -25 °C: 388.3579573 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.383780392 V-1     T = -25 °C: 4.569108877 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.681383547 V-1     T = -25 °C: 8.889141808 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05682246 V-1     T = -25 °C: 13.95832005 V-1
Break-through voltage: T = +20 °C: 439.6100275 V     T = -25 °C: 403.211717 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:04 CET jreher Updated box and position via API.
07. Oct 2020 15:44:11 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:59 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:40 CET jreher Updated APD location via API.
25. Nov 2019 17:29:48 CET jreher Updated box and position via API.
21. Nov 2019 16:53:20 CET spankonin Updated APD location via API.
21. Nov 2019 16:44:13 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:36 CEST Tobias Imported from Hamamatsu datasheet.