RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005211 - Archived data from Tue, 11. August 2020 17:48:18 CEST


This is all the information about APD 0616005211. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005211
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 416.9 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.6648562 V     T = -25 °C: 379.7981311 V
Voltage for Gain 150: T = +20 °C: 424.5906697 V     T = -25 °C: 387.6501317 V
Voltage for Gain 200: T = +20 °C: 428.9625633 V     T = -25 °C: 391.9849603 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.340415107 V-1     T = -25 °C: 4.649853103 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.263087476 V-1     T = -25 °C: 9.284764504 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42836709 V-1     T = -25 °C: 14.53161695 V-1
Break-through voltage: T = +20 °C: 440.0094965 V     T = -25 °C: 407.0781784 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:04 CET jreher Updated box and position via API.
07. Oct 2020 15:44:11 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:59 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:40 CET jreher Updated APD location via API.
25. Nov 2019 17:29:48 CET jreher Updated box and position via API.
21. Nov 2019 16:53:20 CET spankonin Updated APD location via API.
21. Nov 2019 16:44:13 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:36 CEST Tobias Imported from Hamamatsu datasheet.