RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005209 - Archived data from Tue, 11. August 2020 17:47:38 CEST


This is all the information about APD 0616005209. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005209
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.2 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 415.7848171 V     T = -25 °C: 378.3048161 V
Voltage for Gain 150: T = +20 °C: 423.7451699 V     T = -25 °C: 386.2632921 V
Voltage for Gain 200: T = +20 °C: 428.1487539 V     T = -25 °C: 390.6689851 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576964342 V-1     T = -25 °C: 4.437017054 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.083222301 V-1     T = -25 °C: 8.650842997 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12679535 V-1     T = -25 °C: 15.01493782 V-1
Break-through voltage: T = +20 °C: 439.9467126 V     T = -25 °C: 406.6410929 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:10 CET jreher Updated box and position via API.
07. Oct 2020 15:44:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:52 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:25 CET jreher Updated APD location via API.
25. Nov 2019 17:29:29 CET jreher Updated box and position via API.
18. Nov 2019 18:20:59 CET spankonin Updated APD location via API.
18. Nov 2019 18:06:50 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:36 CEST Tobias Imported from Hamamatsu datasheet.