RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005186 - Archived data from Wed, 07. October 2020 15:44:21 CEST


This is all the information about APD 0616005186. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005186
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 447 V
Voltage for Gain 100 (T=+25°C): 419.2 V
Dark current: 14.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.1590394 V     T = -25 °C: 382.4942926 V
Voltage for Gain 150: T = +20 °C: 428.1321001 V     T = -25 °C: 390.2423425 V
Voltage for Gain 200: T = +20 °C: 431.3759251 V     T = -25 °C: 394.4415761 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.513227294 V-1     T = -25 °C: 4.188917273 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.760143854 V-1     T = -25 °C: 8.931164889 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 30.34088434 V-1     T = -25 °C: 16.55232108 V-1
Break-through voltage: T = +20 °C: 439.98517 V     T = -25 °C: 409.5796782 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:51 CET jreher Updated box and position via API.
07. Oct 2020 15:44:21 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:49 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:03 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:37 CET jreher Updated APD location via API.
25. Nov 2019 17:30:07 CET jreher Updated box and position via API.
21. Nov 2019 16:55:43 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:21 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:34 CEST Tobias Imported from Hamamatsu datasheet.