RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005177 - Archived data from Tue, 11. August 2020 17:48:24 CEST


This is all the information about APD 0615005177. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005177
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 453 V
Voltage for Gain 100 (T=+25°C): 424.8 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 425.5150899 V     T = -25 °C: 388.6132143 V
Voltage for Gain 150: T = +20 °C: 433.414893 V     T = -25 °C: 396.4556882 V
Voltage for Gain 200: T = +20 °C: 437.7783038 V     T = -25 °C: 400.7903571 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40087538 V-1     T = -25 °C: 4.404940247 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.639753415 V-1     T = -25 °C: 8.63364395 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13949199 V-1     T = -25 °C: 15.15580628 V-1
Break-through voltage: T = +20 °C: 439.9907585 V     T = -25 °C: 414.997556 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:08 CET jreher Updated box and position via API.
07. Oct 2020 15:44:15 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:02 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:43 CET jreher Updated APD location via API.
25. Nov 2019 17:29:51 CET jreher Updated box and position via API.
21. Nov 2019 16:53:22 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:06 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:33 CEST Tobias Imported from Hamamatsu datasheet.