RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005170 - Archived data from Wed, 07. October 2020 15:44:15 CEST


This is all the information about APD 0615005170. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005170
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 455 V
Voltage for Gain 100 (T=+25°C): 427.8 V
Dark current: 11.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 428.4823276 V     T = -25 °C: 391.5776139 V
Voltage for Gain 150: T = +20 °C: 436.3149386 V     T = -25 °C: 399.4214147 V
Voltage for Gain 200: T = +20 °C: 439.4657565 V     T = -25 °C: 403.7535755 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.436868958 V-1     T = -25 °C: 4.416109161 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.747208117 V-1     T = -25 °C: 8.66094175 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 11.97713639 V-1     T = -25 °C: 15.09366262 V-1
Break-through voltage: T = +20 °C: 439.9756568 V     T = -25 °C: 414.9869977 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:08 CET jreher Updated box and position via API.
07. Oct 2020 15:44:15 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:42 CET jreher Updated APD location via API.
25. Nov 2019 17:29:50 CET jreher Updated box and position via API.
21. Nov 2019 16:53:22 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:40 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:33 CEST Tobias Imported from Hamamatsu datasheet.