RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005167 - Archived data from Tue, 11. August 2020 17:48:22 CEST


This is all the information about APD 0615005167. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005167
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 420.1 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.738996 V     T = -25 °C: 383.889366 V
Voltage for Gain 150: T = +20 °C: 428.5891346 V     T = -25 °C: 391.707251 V
Voltage for Gain 200: T = +20 °C: 432.9209457 V     T = -25 °C: 396.0300424 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.702115853 V-1     T = -25 °C: 4.651208511 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.397230705 V-1     T = -25 °C: 9.341112307 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78537316 V-1     T = -25 °C: 14.66904777 V-1
Break-through voltage: T = +20 °C: 439.9478857 V     T = -25 °C: 411.6485056 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:07 CET jreher Updated box and position via API.
07. Oct 2020 15:44:14 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:42 CET jreher Updated APD location via API.
25. Nov 2019 17:29:50 CET jreher Updated box and position via API.
21. Nov 2019 16:53:22 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:39 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:33 CEST Tobias Imported from Hamamatsu datasheet.