RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005158 - Archived data from Wed, 07. October 2020 15:44:01 CEST


This is all the information about APD 0615005158. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005158
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 420.5 V
Dark current: 14.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.8305296 V     T = -25 °C: 383.4433824 V
Voltage for Gain 150: T = +20 °C: 428.8034354 V     T = -25 °C: 391.3690247 V
Voltage for Gain 200: T = +20 °C: 433.2234621 V     T = -25 °C: 395.751384 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.549055583 V-1     T = -25 °C: 4.385004567 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.974559641 V-1     T = -25 °C: 8.566033787 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97087607 V-1     T = -25 °C: 14.78899281 V-1
Break-through voltage: T = +20 °C: 439.9842913 V     T = -25 °C: 410.9316907 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:33 CET jreher Updated box and position via API.
07. Oct 2020 15:44:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:08 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:22 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:19 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:44 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:18 CET jreher Updated APD location via API.
25. Nov 2019 17:27:19 CET jreher Updated box and position via API.
25. Nov 2019 15:23:30 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:52 CET spankonin Updated APD location via API.
18. Jun 2019 10:18:32 CEST Tobias Imported from Hamamatsu datasheet.