RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0614005073 - Archived data from Tue, 11. August 2020 17:48:44 CEST


This is all the information about APD 0614005073. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0614005073
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 408.1 V
Dark current: 10 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 249
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 408.3839936 V     T = -25 °C: 370.7471185 V
Voltage for Gain 150: T = +20 °C: 416.3383528 V     T = -25 °C: 378.6551977 V
Voltage for Gain 200: T = +20 °C: 420.7236597 V     T = -25 °C: 383.0107824 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426527054 V-1     T = -25 °C: 4.657627409 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.658017797 V-1     T = -25 °C: 9.306591169 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14411226 V-1     T = -25 °C: 14.63960865 V-1
Break-through voltage: T = +20 °C: 433.8475658 V     T = -25 °C: 397.2568097 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:23 CET jreher Updated box and position via API.
11. Aug 2020 17:48:44 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:21 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:04 CET jreher Updated APD location via API.
25. Nov 2019 17:29:59 CET jreher Updated box and position via API.
21. Nov 2019 16:54:43 CET spankonin Updated APD location via API.
21. Nov 2019 16:37:00 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:25 CEST Tobias Imported from Hamamatsu datasheet.