RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005058 - Archived data from Wed, 07. October 2020 15:44:16 CEST


This is all the information about APD 0613005058. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005058
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 454 V
Voltage for Gain 100 (T=+25°C): 425.9 V
Dark current: 16 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 426.0821298 V     T = -25 °C: 389.2364276 V
Voltage for Gain 150: T = +20 °C: 433.9798923 V     T = -25 °C: 397.0683583 V
Voltage for Gain 200: T = +20 °C: 438.3509344 V     T = -25 °C: 401.4121836 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520164274 V-1     T = -25 °C: 4.525023773 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.982935557 V-1     T = -25 °C: 8.946208678 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96989878 V-1     T = -25 °C: 15.75774178 V-1
Break-through voltage: T = +20 °C: 439.990137 V     T = -25 °C: 414.991032 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:12 CET jreher Updated box and position via API.
07. Oct 2020 15:44:16 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:09 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:51 CET jreher Updated APD location via API.
25. Nov 2019 17:29:52 CET jreher Updated box and position via API.
21. Nov 2019 16:54:02 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:07 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:24 CEST Tobias Imported from Hamamatsu datasheet.