RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005054 - Archived data from Wed, 07. October 2020 15:44:16 CEST


This is all the information about APD 0613005054. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005054
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A05
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 427.3 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 426.3303998 V     T = -25 °C: 389.3110879 V
Voltage for Gain 150: T = +20 °C: 434.2303965 V     T = -25 °C: 397.1379773 V
Voltage for Gain 200: T = +20 °C: 438.6059121 V     T = -25 °C: 401.480568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.441440879 V-1     T = -25 °C: 4.50954302 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.733382301 V-1     T = -25 °C: 8.907215952 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26554644 V-1     T = -25 °C: 15.70879508 V-1
Break-through voltage: T = +20 °C: 439.9796568 V     T = -25 °C: 414.523867 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:11 CET jreher Updated box and position via API.
07. Oct 2020 15:44:16 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:08 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:50 CET jreher Updated APD location via API.
25. Nov 2019 17:29:52 CET jreher Updated box and position via API.
21. Nov 2019 16:54:01 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:07 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:23 CEST Tobias Imported from Hamamatsu datasheet.