RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005052 - Archived data from Wed, 07. October 2020 15:44:16 CEST


This is all the information about APD 0613005052. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005052
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 456 V
Voltage for Gain 100 (T=+25°C): 427.9 V
Dark current: 12.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 248
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 427.4491185 V     T = -25 °C: 390.855564 V
Voltage for Gain 150: T = +20 °C: 435.2908095 V     T = -25 °C: 398.6209434 V
Voltage for Gain 200: T = +20 °C: 439.473289 V     T = -25 °C: 402.9026714 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.451857856 V-1     T = -25 °C: 4.723877484 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.785284029 V-1     T = -25 °C: 9.490703666 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.63619057 V-1     T = -25 °C: 15.03811563 V-1
Break-through voltage: T = +20 °C: 440.0128309 V     T = -25 °C: 415.0195641 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:11 CET jreher Updated box and position via API.
07. Oct 2020 15:44:16 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:08 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:50 CET jreher Updated APD location via API.
25. Nov 2019 17:29:52 CET jreher Updated box and position via API.
21. Nov 2019 16:54:01 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:06 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:23 CEST Tobias Imported from Hamamatsu datasheet.