RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005029 - Archived data from Wed, 07. October 2020 15:46:10 CEST


This is all the information about APD 0613005029. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005029
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 423.8 V
Dark current: 13.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.5591922 V     T = -25 °C: 386.3325811 V
Voltage for Gain 150: T = +20 °C: 431.4434651 V     T = -25 °C: 394.195228 V
Voltage for Gain 200: T = +20 °C: 435.7978276 V     T = -25 °C: 398.5395137 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.674575868 V-1     T = -25 °C: 4.422953639 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.229487371 V-1     T = -25 °C: 8.594399276 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34917493 V-1     T = -25 °C: 14.76256193 V-1
Break-through voltage: T = +20 °C: 439.9984896 V     T = -25 °C: 413.812163 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:11 CET jreher Updated box and position via API.
03. Feb 2021 18:19:54 CET jreher Updated box and position via API.
07. Oct 2020 15:46:10 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:10 CET jreher Updated APD location via API.
25. Nov 2019 17:14:34 CET jreher Updated box and position via API.
04. Jul 2019 11:11:54 CEST jreher Updated APD location via API.
18. Jun 2019 13:34:38 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 10:18:21 CEST Tobias Imported from Hamamatsu datasheet.