RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005026 - Archived data from Tue, 11. August 2020 17:27:21 CEST


This is all the information about APD 0613005026. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005026
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 450 V
Voltage for Gain 100 (T=+25°C): 422.5 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 427.6893617 V     T = -25 °C: 390.8623343 V
Voltage for Gain 150: T = +20 °C: 435.5996478 V     T = -25 °C: 398.7125487 V
Voltage for Gain 200: T = +20 °C: 439.3867425 V     T = -25 °C: 402.9835396 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.221765395 V-1     T = -25 °C: 4.966651811 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.474776974 V-1     T = -25 °C: 9.947895562 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 12.68603882 V-1     T = -25 °C: 13.67003281 V-1
Break-through voltage: T = +20 °C: 440.0014986 V     T = -25 °C: 415.0044717 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:10 CET jreher Updated box and position via API.
03. Feb 2021 18:19:54 CET jreher Updated box and position via API.
07. Oct 2020 15:46:09 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:10 CET jreher Updated APD location via API.
25. Nov 2019 17:14:34 CET jreher Updated box and position via API.
04. Jul 2019 11:11:53 CEST jreher Updated APD location via API.
18. Jun 2019 13:30:08 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 10:18:21 CEST Tobias Imported from Hamamatsu datasheet.