RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0613005021 - Archived data from Wed, 07. October 2020 15:46:09 CEST


This is all the information about APD 0613005021. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0613005021
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 423.7 V
Dark current: 16.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 46
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 429.8167331 V     T = -25 °C: 392.7677988 V
Voltage for Gain 150: T = +20 °C: 437.752749 V     T = -25 °C: 400.6120269 V
Voltage for Gain 200: T = +20 °C: 439.357172 V     T = -25 °C: 404.9938235 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.60263191 V-1     T = -25 °C: 4.771171376 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.366895999 V-1     T = -25 °C: 7.993590253 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 9.807286467 V-1     T = -25 °C: 15.22392542 V-1
Break-through voltage: T = +20 °C: 439.9372716 V     T = -25 °C: 414.9332979 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:09 CET jreher Updated box and position via API.
03. Feb 2021 18:19:53 CET jreher Updated box and position via API.
07. Oct 2020 15:46:09 CEST jreher Updated APD location via API.
11. Aug 2020 17:27:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:37:10 CET jreher Updated APD location via API.
25. Nov 2019 17:14:33 CET jreher Updated box and position via API.
04. Jul 2019 11:11:53 CEST jreher Updated APD location via API.
18. Jun 2019 13:30:07 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 10:18:20 CEST Tobias Imported from Hamamatsu datasheet.