RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004976 - Archived data from Wed, 07. October 2020 15:44:23 CEST


This is all the information about APD 0612004976. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004976
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 416.4 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.7391184 V     T = -25 °C: 379.4623132 V
Voltage for Gain 150: T = +20 °C: 424.6328147 V     T = -25 °C: 387.316194 V
Voltage for Gain 200: T = +20 °C: 428.9887452 V     T = -25 °C: 391.6582726 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.648276017 V-1     T = -25 °C: 4.445618087 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.305657892 V-1     T = -25 °C: 8.74412951 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.60370001 V-1     T = -25 °C: 15.35120043 V-1
Break-through voltage: T = +20 °C: 439.9968636 V     T = -25 °C: 406.6957461 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:55 CET jreher Updated box and position via API.
07. Oct 2020 15:44:23 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:54 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:05 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:40 CET jreher Updated APD location via API.
25. Nov 2019 17:30:10 CET jreher Updated box and position via API.
21. Nov 2019 16:55:46 CET spankonin Updated APD location via API.
21. Nov 2019 16:35:48 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:16 CEST Tobias Imported from Hamamatsu datasheet.