RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004975 - Archived data from Wed, 07. October 2020 15:44:23 CEST


This is all the information about APD 0612004975. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004975
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 447 V
Voltage for Gain 100 (T=+25°C): 419.6 V
Dark current: 17.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 419.2293774 V     T = -25 °C: 382.3988648 V
Voltage for Gain 150: T = +20 °C: 427.1192734 V     T = -25 °C: 390.2511168 V
Voltage for Gain 200: T = +20 °C: 431.4868884 V     T = -25 °C: 394.6069435 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515333117 V-1     T = -25 °C: 4.442962498 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.86843942 V-1     T = -25 °C: 8.766231156 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56702412 V-1     T = -25 °C: 15.37800889 V-1
Break-through voltage: T = +20 °C: 439.9922841 V     T = -25 °C: 409.6735568 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:54 CET jreher Updated box and position via API.
07. Oct 2020 15:44:23 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:54 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:05 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:40 CET jreher Updated APD location via API.
25. Nov 2019 17:30:10 CET jreher Updated box and position via API.
21. Nov 2019 16:55:45 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:23 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:16 CEST Tobias Imported from Hamamatsu datasheet.