RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004965 - Archived data from Tue, 11. August 2020 17:48:52 CEST


This is all the information about APD 0612004965. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004965
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 452 V
Voltage for Gain 100 (T=+25°C): 424.4 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.3264747 V     T = -25 °C: 387.6522739 V
Voltage for Gain 150: T = +20 °C: 432.2795711 V     T = -25 °C: 395.4787861 V
Voltage for Gain 200: T = +20 °C: 436.6701506 V     T = -25 °C: 399.7979709 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.395046715 V-1     T = -25 °C: 4.711954199 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.517885959 V-1     T = -25 °C: 9.39057423 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74325343 V-1     T = -25 °C: 14.82150358 V-1
Break-through voltage: T = +20 °C: 439.8885702 V     T = -25 °C: 414.508605 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:53 CET jreher Updated box and position via API.
07. Oct 2020 15:44:22 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:52 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:05 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:39 CET jreher Updated APD location via API.
25. Nov 2019 17:30:09 CET jreher Updated box and position via API.
21. Nov 2019 16:55:45 CET spankonin Updated APD location via API.
21. Nov 2019 16:36:23 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:15 CEST Tobias Imported from Hamamatsu datasheet.