RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3802038588 - Archived data from Tue, 11. August 2020 17:28:46 CEST


This is all the information about APD 3802038588. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3802038588
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 19.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 50
Position in Box: 17
EP1 batch: 6
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0506668 V     T = -25 °C: 344.8546388 V
Voltage for Gain 150: T = +20 °C: 386.7543702 V     T = -25 °C: 352.0148886 V
Voltage for Gain 200: T = +20 °C: 391.0579083 V     T = -25 °C: 356.0331912 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.729308288 V-1     T = -25 °C: 5.187182399 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.468519744 V-1     T = -25 °C: 9.922426941 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90422355 V-1     T = -25 °C: 16.02515874 V-1
Break-through voltage: T = +20 °C: 406.6859491 V     T = -25 °C: 371.035896 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:47 CET jreher Updated box and position via API.
03. Feb 2021 18:20:23 CET jreher Updated box and position via API.
11. Aug 2020 17:28:46 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:13 CET jreher Updated APD location via API.
25. Nov 2019 17:14:52 CET jreher Updated box and position via API.
15. Jul 2019 13:01:29 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:59:29 CEST markus.moritz
20. Jun 2019 19:34:02 CEST jreher Updated APD location via API.
12. Jun 2019 17:17:32 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 17:14:26 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:42:51 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:57 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:56 CEST Tobias Imported from Hamamatsu datasheet.