RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3710038425 - Archived data from Tue, 11. August 2020 17:28:36 CEST


This is all the information about APD 3710038425. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3710038425
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 48
Position in Box: 50
EP1 batch: 4
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.4439854 V     T = -25 °C: 342.4848649 V
Voltage for Gain 150: T = +20 °C: 384.1083212 V     T = -25 °C: 349.5983632 V
Voltage for Gain 200: T = +20 °C: 388.4010112 V     T = -25 °C: 353.5876272 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.631701617 V-1     T = -25 °C: 4.93262574 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.244853301 V-1     T = -25 °C: 9.446754757 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41731074 V-1     T = -25 °C: 15.09580943 V-1
Break-through voltage: T = +20 °C: 403.6585066 V     T = -25 °C: 368.2690279 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:35 CET jreher Updated box and position via API.
03. Feb 2021 18:20:11 CET jreher Updated box and position via API.
11. Aug 2020 17:28:36 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:30:54 CET jreher Updated APD location via API.
25. Nov 2019 17:14:45 CET jreher Updated box and position via API.
15. Jul 2019 13:00:54 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 10:17:11 CEST markus.moritz
20. Jun 2019 18:30:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:50 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:54 CEST Tobias Imported from Hamamatsu datasheet.