RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3703038273 - Archived data from Tue, 11. August 2020 17:28:38 CEST


This is all the information about APD 3703038273. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3703038273
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 24.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 49
Position in Box: 15
EP1 batch: 1
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9903622 V     T = -25 °C: 345.121578 V
Voltage for Gain 150: T = +20 °C: 386.6935918 V     T = -25 °C: 352.2090694 V
Voltage for Gain 200: T = +20 °C: 391.0175478 V     T = -25 °C: 356.1726132 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.800253705 V-1     T = -25 °C: 5.182958566 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.861390411 V-1     T = -25 °C: 10.204382 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.47968147 V-1     T = -25 °C: 16.71281139 V-1
Break-through voltage: T = +20 °C: 406.0059261 V     T = -25 °C: 370.6796957 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:39 CET jreher Updated box and position via API.
03. Feb 2021 18:20:15 CET jreher Updated box and position via API.
11. Aug 2020 17:28:38 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:02 CET jreher Updated APD location via API.
25. Nov 2019 17:14:47 CET jreher Updated box and position via API.
15. Jul 2019 13:01:12 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 09:52:30 CEST markus.moritz
20. Jun 2019 18:30:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:40:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:42 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:50 CEST Tobias Imported from Hamamatsu datasheet.