RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3701038236 - Archived data from Tue, 11. August 2020 17:28:37 CEST


This is all the information about APD 3701038236. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3701038236
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F12
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 8.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 49
Position in Box: 4
EP1 batch: 1
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 28. Jun 2019
Sent for analysis after irradiation: 08. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0247096 V     T = -25 °C: 345.498242 V
Voltage for Gain 150: T = +20 °C: 387.6612902 V     T = -25 °C: 352.6424765 V
Voltage for Gain 200: T = +20 °C: 391.8973839 V     T = -25 °C: 356.6437058 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.769509241 V-1     T = -25 °C: 4.9132226 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.720444135 V-1     T = -25 °C: 9.337073265 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.60290361 V-1     T = -25 °C: 17.15755659 V-1
Break-through voltage: T = +20 °C: 406.7829975 V     T = -25 °C: 371.2850703 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:54:38 CET jreher Updated box and position via API.
03. Feb 2021 18:20:14 CET jreher Updated box and position via API.
11. Aug 2020 17:28:37 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:31:02 CET jreher Updated APD location via API.
25. Nov 2019 17:14:46 CET jreher Updated box and position via API.
15. Jul 2019 13:00:54 CEST spankonin Updated APD batch assignment via API.
08. Jul 2019 09:54:46 CEST markus.moritz
20. Jun 2019 18:30:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:42:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:41:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:40:35 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:38:41 CEST jreher Updated APD batch assignment via API.
25. Apr 2019 15:14:50 CEST Tobias Imported from Hamamatsu datasheet.