RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3408036995 - Archived data from Fri, 05. February 2021 11:09:12 CET


This is all the information about APD 3408036995. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3408036995
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 162
Position in Box: 45
EP1 batch: 195
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0781656 V     T = -25 °C: 344.6592503 V
Voltage for Gain 150: T = +20 °C: 387.8717842 V     T = -25 °C: 352.0039663 V
Voltage for Gain 200: T = +20 °C: 392.2012159 V     T = -25 °C: 356.1227943 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.629184501 V-1     T = -25 °C: 4.723558582 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.205812332 V-1     T = -25 °C: 9.593051098 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3822956 V-1     T = -25 °C: 15.21045184 V-1
Break-through voltage: T = +20 °C: 407.7450361 V     T = -25 °C: 371.3534483 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:00 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:32 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:09:12 CET jreher Updated box and position via API.
11. Aug 2020 18:03:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:56 CEST jreher Updated APD location via API.
10. Feb 2020 19:00:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:56 CET jreher Updated APD location via API.
27. Nov 2019 19:57:34 CET jreher Updated APD location via API.
25. Nov 2019 17:23:44 CET jreher Updated box and position via API.
04. Oct 2019 12:11:37 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:47 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:52 CET Tobias Imported from Hamamatsu datasheet.