RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3405036735 - Archived data from Tue, 11. August 2020 17:55:31 CEST


This is all the information about APD 3405036735. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3405036735
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 7.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 159
Position in Box: 38
EP1 batch: 190
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.469917 V     T = -25 °C: 344.3268449 V
Voltage for Gain 150: T = +20 °C: 387.280482 V     T = -25 °C: 351.6674441 V
Voltage for Gain 200: T = +20 °C: 391.6363837 V     T = -25 °C: 355.7839213 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.485725882 V-1     T = -25 °C: 4.85739361 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.736704312 V-1     T = -25 °C: 9.861973294 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.24761907 V-1     T = -25 °C: 15.81587006 V-1
Break-through voltage: T = +20 °C: 407.5430501 V     T = -25 °C: 371.2999528 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:06 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:04 CEST jreher Updated box and position via API.
05. Feb 2021 11:08:47 CET jreher Updated box and position via API.
11. Aug 2020 17:55:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:42 CEST jreher Updated APD location via API.
12. Dec 2019 14:37:47 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:46 CET jreher Updated APD location via API.
27. Nov 2019 19:57:01 CET jreher Updated APD location via API.
25. Nov 2019 17:23:30 CET jreher Updated box and position via API.
04. Oct 2019 12:08:58 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:57:23 CEST jreher Updated APD location via API.
21. Dec 2018 11:46:48 CET Tobias Imported from Hamamatsu datasheet.