RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3315036387 - Archived data from Tue, 11. August 2020 18:02:50 CEST


This is all the information about APD 3315036387. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3315036387
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 35.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 155
Position in Box: 40
EP1 batch: 184
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1241527 V     T = -25 °C: 351.9476592 V
Voltage for Gain 150: T = +20 °C: 394.8526063 V     T = -25 °C: 359.2146922 V
Voltage for Gain 200: T = +20 °C: 399.1390154 V     T = -25 °C: 363.2939798 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.633064611 V-1     T = -25 °C: 5.020528889 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.316721294 V-1     T = -25 °C: 9.465811646 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56950464 V-1     T = -25 °C: 15.04685828 V-1
Break-through voltage: T = +20 °C: 413.6348915 V     T = -25 °C: 377.6128622 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:08:16 CET jreher Updated box and position via API.
11. Aug 2020 18:02:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:52:25 CEST jreher Updated APD location via API.
03. Feb 2020 14:21:47 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:32 CET jreher Updated APD location via API.
27. Nov 2019 19:56:17 CET jreher Updated APD location via API.
25. Nov 2019 17:23:11 CET jreher Updated box and position via API.
01. Oct 2019 11:33:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:56:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:27 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:35 CEST Tobias Imported from Hamamatsu datasheet.